All MSG-3 Analyses

This chapter discusses several common features that are similar in all MSG-3 analyses and/or must be determined up-front for the entire database. This includes:

For features that are specific to a particular type of analysis, see Systems and Powerplant Analysis, Structural Analysis or Zonal and L/HIRF Analysis.

Time Units

In MPC, the units (defined in the Unit Settings window) can be used in the Interval field for maintenance task records, if desired. Some of the reasons why you might choose to define the task interval with a number and unit (instead of a text field that places no constraints on how users type information):

  • May increase the likelihood that task intervals will be defined consistently (i.e., if users always enter a value and select the units from a drop-down list, it will be less likely to have inconsistent abbreviations for entered data – 100 flight hours, 100 flt/hrs, 100 flight hrs., etc.).
  • Makes it easier to sort tasks by interval.
  • Gives you the ability to import the analysis project into RCM++ so that you can perform more flexible, data-based maintenance analysis.

Tip: When you convert an existing analysis project from MPC 3, the Tasks Conversion window allows you to decide whether the imported tasks will continue to define the intervals in text fields or if you prefer to convert the existing records to use numerical values with predefined time units.