Control Plan > Sync Options

The Control Plan > Sync Options page of the interface style determines how control plan data will be created when a new control plan is added to an analysis.

You can start a control plan with a blank worksheet or with data imported from either FMEAs or a PFD worksheet. Below are descriptions of the options available for FMEAs and PFD worksheets.

FMEA

In the Map Records for Transfer area, select which data to transfer as process names and cause descriptions in the control plan:

In the Transfer Controls Options area, select the All controls option to transfer all the controls from the FMEA to the control plan. To transfer only the controls that meet the desired requirements, select the Controls where type= option and then select the required control type from the drop-down list.

PFD Worksheet

Related Topics and Links